Audit · Manufacturing

−525 HP

We measured actual volumetric capacity and set the most efficient compressors as lead units.

Energy
−14%
Savings
US$397,000
CO₂ avoided
561.5 t

Outsourcing · 10-year contract

−44.3%

Before12.68 GWh
After7.06 GWh
Annual savings
US$684,614
CO₂ avoided
923.3 t
36,000 scfm compressed air system

Turnkey · Colombia

36,000 scfm

Complete system for a new plant, with annual savings above US$2.5 million.

Small industry

−41 % · COP 22M/yr · 5.18 t CO₂

Medium industry

−48 % · COP 341M/yr · 155.5 t CO₂

Large industry

−44.3% · COP 2,190M/yr · 923.3 t CO₂